2012 national competition project #169 | cafeteria redesign
|wsheldon's work for the Collect Information step:
Summary
Photos were taken of the cafeteria and floor plans were provided.
The food processing portion of the cafeteria was remodeled in 2009. Staff believes that the...
The cafeteria was expanded in 2009 so the issue is not the available space (There are no more than...
wsheldon's work for the Brainstorm Ideas step:
Summary
The actual food serving part of the cafeteria will not be changed, as it was remodeled in 2009, and is as efficient as it can be.
The current windows will not be changed as the provide a welcoming, wide open view of the outdoors.
The yellow arrow indicates the current location of the cafeteria. Moving the cafeteria would not...
The red arrows represent the path of the sun in the springtime. No matter what season, the suns...
wsheldon's work for the Develop Solutions step:
Summary
Since our cafeteria was expanded and renovated very recently, our solutions were narrowed down to a few different things:
This is a rough model of the cafeteria's outdoor seating area. The door and windows already...
The current set up counters of 4 checkout stations will be used as it is both efficient and up to...
The current tray dropoff will also remain unchanged. It is already located very conveniently close...
As has been previously stated, the cafeteria was redone in 2009 so there is ample space for the...
As has been previously stated, the cafeteria was redone in 2009 so there is ample space for the...