2012 national competition project #024 | cafeteria redesign

Summary

I was going to focus mainly on the cafeteria, and not do anything to the kitchen. What I ended up doing was redesigning the courtyard, adding some booths to the cafeteria, and re-tiled the floor. The main concern I saw was that the custodial staff don't have enough storage space, so i put a 35X25 extension to the South West corner of the courtyard with access from inside the building.