Summary
On my way to developing solutions for the problems I proposed in my brainstorming, I found
that some things do not seem to be as problematic as they were originally stated by me. I’ve also found
new problems to solve, such as: the inability to play other sports in the gym besides soccer, basketball
and volley ball. Our current court for basketball has very limited space, and it will not be enough for a
full class to play basketball even with half courts. While designing solution to these problems on the first
floor gym, I also renovated the balcony track field on the second floor.