Redesign Your School Athletic Pavilion | 2014 National High School Architecture Competition #133

Summary

Final design for my project is very simple and I wanted to keep it simple. Modified floor plan and yet keeping its original model outline was one of my main priority to maintain while making this project. Students will have easy access to the gym through the front and both side entrance as well as rear door if needed. For the student's safety, there were many emergency exits that where placed especially with the big floor plan, good door placement where needed. At last, here is some of my rendering.