01/23/15
This is the floor plan for the first floor of our school addition. On the left side is the running track with the basketball courts. On the right side, we have the locker rooms and bathrooms. There are stains inside the locker room in order to get to go the showers and to the second floor. Also, on the far right is the weight room.