2012 national competition project #180 | cafeteria redesign

Summary

I went to the Cafeteria and took photos and measurements of the existing layout and existing tables. I asked about anything that couldn't be removed or changed and learned that the 3 pillars in the middle of the cafeteria hold drainage systems for the roof as well as air ventilation.