Mira Loma High School Library Re-design

05/29/15
This is a watercolor rendering of the outside of the main building that houses the library, computer labs, and elevator tower. To the left-most section of the paper is the elevator, and the farthest right section of the building is the main entrance for the library, with the computer labs above it. The overall exterior is the same, though the inside has been revamped extensively, as evidenced by the pictures of the renderings in the Final Draft Section.