Recreation of Mira Loma High School Cafeteria

09/22/12
(boys/girls bathrooms) The pics above show the redesigned bathrooms for girls and for boys. The current cafeteria bathroom has 2 stalls only and one of the doors in the girls bathroom is broken. This issue creates a long line and uncomfortable conditions. Also there are only 2 sinks and 2 small mirrors. Our team has redesigned the bathrooms to have 5 stalls and 4-3 sinks and a full length mirror in both the girls and boys bathrooms.

Comments

Is your cafeteria going to have 4 bathrooms total or is that two pictures of the girls and boys bathroom? Nice idea to have the full length mirrors. The girls will love that! Rufa Pazyuk- Dynamic Designs

Director of Interior Design- Rimma Sadyrova
Yes we will have two bathrooms downstairs and two upstairs, boys & girls. And thank you for the positive comment.

i love the bathroom set up its very nice in my opinion. Just consider multiple mirrors for the girls bathroom. and where are the lights in the bathroom? are the lights there?
-Amanda Russell, Director of Interior Decor Design

Director of Interior Design- Rimma Sadyrova
Thank you for your positive feedback Amanda. We have a huge full length mirror in both girls and boys bathrooms, not to mention more sinks and stalls. As for the lights we will certainly have lights but they will placed on the ceiling (look at sketches on the Brainstorm Tab).

I like the idea that you will have two bathrooms up stairs and down stairs. Also its very convenient for the girls that there are full lenght mirrors.Anna Merkushev:Dynamic Designs.

Director of Interior Design- Rimma Sadyrova
Thank you Anna Merkushev for your positive feedback.

This all seems very professional but do you have any pictures of your foam cut outs you could add?
Elite Innovative Solutions- Mitchell Zaborski

Director of Interior Design- Rimma Sadyrova
Do you mean photos of our model? We have a few pictures of our progress with the model in the Final Tab and more will be added soon. Thank you for your input.

Gor Mikelyan-Director of Exterior Design
Mitchell, are you talking about foam cuts of the space above, or the whole design of the cafeteria. Most of the detail is in google sketch-up, and not so much detail needed on the scale model.

We have incorporated this in your IT certification 200-120 exams certification review materials. In this way, it is the same as taking the actual final exam already. The difference is that the result is predictable, you succeed. IT certification 1z0-516 exams